Pune Metro Pink Line projects worth ₹21,800 crore will witness formal inauguration and foundation stone laying by Prime Minister Narendra Modi today. Specifically, PM Modi will launch the new metro line via video conferencing on November 3, 2026, at 12:30 PM. Furthermore, this major infrastructure expansion will transform urban transit between key employment hubs and residential zones across Pune.
Project cost, total length, and key station corridors
The newly completed Line 3 project, widely known as the Pink Line, represents an investment of over ₹8,300 crore. Specifically, the corridor spans approximately 23 kilometres, directly connecting Maan to the District Court Metro station.
Additionally, the route links the bustling Hinjewadi IT hub directly with Shivajinagar. Consequently, thousands of software professionals and daily commuters will experience reduced travel times, lower road traffic congestion, and lower vehicle emissions.
| Project Parameter | Pune Metro Line 3 (Pink Line) Details |
| Official Name | Pune Metro Line 3 / Pink Line |
| Inauguration Date | November 3, 2026 (by PM Narendra Modi) |
| Total Project Cost | Over ₹8,300 crore |
| Route Length | Approximately 23 kilometres |
| Key Terminals | Maan to District Court Metro Station |
| Primary Beneficiaries | IT professionals commuting between Hinjewadi and Shivajinagar |
Women-led operations and solar energy focus
A major feature of the Pune Metro Pink Line centers on gender-inclusive operations and environmental sustainability. Specifically, an all-women team of train operators will run the entire fleet, setting a pioneering benchmark in public transport.
Furthermore, the project integrates green energy infrastructure into its daily operations. Specifically, clean solar power will generate approximately 30% of the network’s total electricity requirements, drastically reducing its carbon footprint.
Expansion plans under Pune Metro Phase 2
Alongside the inauguration, PM Modi will lay the foundation stone for Pune Metro Phase-II, budgeted at ₹13,500 crore. Specifically, Phase-II incorporates Lines 2A, 2B, 4, and 4A to widen citywide reach.
Furthermore, Line 2A extends from Vanaz to Chandani Chowk, while Line 2B links Ramwadi to Vitthalwadi over 12.75 kilometres. Meanwhile, Line 4 spans 25.52 kilometres from Kharadi to Khadakwasla, complemented by Line 4A connecting Nal Stop to Manik Baug across 6.12 kilometres.
| Phase-II Metro Line | Corridor Alignment & Coverage | Total Length |
| Line 2A | Vanaz to Chandani Chowk | Combined 12.75 km |
| Line 2B | Ramwadi to Vitthalwadi | (Line 2A + Line 2B) |
| Line 4 | Kharadi to Khadakwasla | 25.52 km |
| Line 4A | Nal Stop to Manik Baug | 6.12 km |
Interchange stations at Swargate, Nal Stop, and Kharadi Bypass will integrate seamlessly with intercity bus services. Therefore, as the Pune Metro Pink Line enters service, Pune gains an integrated, world-class transit system.

