Egypt introduces first Alstom trains under Cairo Metro Line 1 modernisation programme

4 Min Read
cairo-metro-line-1-alstom-new-trains-egypt

Egypt has introduced the first two new air-conditioned trains on Cairo Metro Line 1. The launch marks the beginning of deliveries under a contract with French company Alstom.

The contract covers 55 trains comprising 495 carriages. It also includes eight years of maintenance, major overhauls and spare parts.

Transport Minister Kamel Al-Wazir attended the launch ceremony alongside French Ambassador Éric Chevallier. National Authority for Tunnels Chairman Tarek Goweili and Alstom representatives also attended.

During the visit, Al-Wazir travelled aboard a new train from Saray El-Qobba to Sadat station. The journey covered eight intermediate stations, allowing him to inspect its technical specifications and passenger facilities.

Alstom trains bring upgraded passenger facilities

Each new train consists of nine air-conditioned carriages. Furthermore, secure connections between carriages allow passengers to move safely throughout the train.

The trains feature CCTV cameras in drivers’ cabins and passenger carriages. These systems enable monitoring of drivers and transmit footage directly to the central control centre.

Additionally, LCD screens display passenger information and instructions. Screens above the side doors indicate the train’s final destination.

Illuminated electronic maps also display routes and stations. Moreover, designated spaces accommodate wheelchair users and include securing systems.

Al-Wazir said the new trains would improve operational efficiency, passenger comfort and safety. He described their introduction as a major step in modernising the country’s oldest metro line.

Cairo Metro Line 1 modernisation extends beyond new trains

The modernisation programme also covers existing rolling stock and railway infrastructure.

Work is underway to rehabilitate and maintain 23 existing trains in cooperation with a Spanish company. Meanwhile, Egyptian and French companies are upgrading signalling, communications and central control systems.

The programme also covers tracks, power supply and electromechanical systems. Additionally, the Tora workshop is being modernised to maintain the new fleet and rehabilitated trains.

The Alstom contract includes modern equipment for the Tora workshop. This will help ensure its readiness to maintain the incoming fleet over the long term.

The ministry is also preparing to tender construction works for a new Sheikh Mansour station. The proposed station will be located between Ezbet El-Nakhl and New Marg stations.

Egypt plans wider upgrades to public transport controls

Al-Wazir said the government plans to establish a unified control and monitoring centre. It will cover all electric traction transport systems.

The government also plans a central control centre for the national railway network. The network extends approximately 10,000 kilometres.

Cairo Metro Line 1 stretches 44 kilometres between Helwan and New Marg. It serves 35 stations and forms a central part of Greater Cairo’s metro network.

The line was the first metro line in Africa, the Middle East and the Arab region.

The ministry expects the ongoing upgrades to shorten train intervals and increase passenger capacity. Consequently, services are expected to become more regular, reducing waiting times.

Al-Wazir said the ministry would continue upgrading existing metro lines and expanding the network. The broader objective is to develop integrated and sustainable public transport.

The programme is also intended to reduce carbon emissions and support urban and economic development.

Share This Article
Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *